GREENWICH MILLENNIUM VILLAGE
Fire Stopping : Armfix Ltd
67 Park Central occupies a prime position within the village. In total, the phase will offer 115 one to three-bedroom apartments, many with panoramic views over the park, river, city or beautifully landscaped podium garden. What’s more, each of the homes includes private outdoor space and carefully considered feature glazing, designed to capitalise on the inspiring views.
ARMFIX LTD were honoured to be part of the Greenwich Millennium Peninsula fire protection infrastructure. More specifically, we supplied firestopping for all of the service penetrations throughout the building. ‘Service penetrations’ refers to how cables, wires, and other services can potentially compromise any compartmentation – a key part of any passive fire protection system.
To ensure the highest level of protection, all service penetrations must be audited and firestopped where appropriate. There are multiple important factor ensure the highest level of protection, all service penetrations must be audited and firestopped where appropriate. There are multiple important factors to consider when firestopping service penetrations:
The location of the service penetration, e.g. in a wall or floor
Whether the wall or floor is load-bearing
Does the penetration need to be smoke and gas tight?
Does the seal need to be flexible to accommodate movement?
Each potential breach was thoroughly reviewed, with the most intricate of details accounted for. Following this review, our team swiftly rectified all identified service penetrations.
For this project our company has worked together with:
PROMAT
Promat, the global leader in passive fire protection. They have offered a complete portfolio of certified and tested products and systems to design and build a fully reliable fire safety solution for your building project. With more than 60 years of experience and know-how, they have helped us to complete a successful project.
Promat Promaseal® fire stopping products are used to seal gaps in walls, floors and ceilings and reinstate the fire performance of compartment walls & floors after services have been installed
PLATT HALLS
Client : Optivo
Main Contractor : R.Benson
Fire Stopping : Armfix Ltd
We have extensive experience in retrofit and restoring existing fire stopping compartimentation.
For this project our company has worked together with:
ROCKWOOL
In the event of a fire, ROCKWOOL fire resistant insulation slows the growth and spread of fire. ROCKWOOL stone wool does not produce dangerous toxic smoke and helps protect the building’s load-bearing structure, protecting lives and investment.
The fire protection qualities of Rockwool products helped to increase the safety of the occupants – and protect nearby buildings too.
BATTERSEA POWER STATION
Fire Stopping : Armfix GROUP Ltd
Battersea Power Station to deliver the first 386 affordable homes at the development.
All homes will have private outdoor space – balconies, terraces, access to private residents’ gardens and 98% will be dual aspect. The development is also expected to comprise a new £13 million NHS medical centre, as well as workspaces for start-up businesses.
For this project our company has worked together with:
HILTI
Hilti have helped with specification and design for passive fire protection systems.
They have offer Armfix Ltd cutting-edge products, easy to use design software and technical backup onsite, online and on the phone.
Hilti pre-formed firestop products have increase the job productivity. They have come with firestop material already inside, making them easy and fast to install, retrofit and inspect.